Summary

A leading global supplier of structural adhesives commissioned MCL Energy to Design, Build, Finance and Operate their new boilerhouse.

The Solution

The Energy Centre installation includes project management, natural gas site infrastructure, steam and condensate connection, civil works, steam plant installation, and plant project capital.

Following successful completion an operation and support contract was awarded comprising plant performance, daily operation, planned preventative maintenance, emergency call out and remote plant monitoring

The Benefits

  • Energy cost savings of 30.5% or 1998MWh (in 6 months!)
  • Guaranteed fixed costs and lower emissions
  • Plant configured steam load for maximum efficiency
  • Monthly Energy Performance Reporting
  • 24hr Emergency Breakdown response
  • Access to multi-skilled engineering team

How can we help you?

MCL can help you to make energy cost savings and improve plant performance at your manufacturing site.

If you are interested, just call and speak to Business Development on +44(0)1623 741940 or send us an email.

MCL Energy