WARM AIR HEATING CASE STUDY OVERVIEW

  • 40% energy savings (Phase One)
  • Improved plant reliability/performance
  • Accurately budget energy costs

Summary

Prestigious East Yorshire based mobile holiday home and specialist applications manufacturer awarded MCL Energy the contract to replace their aging, inefficient office and factory heating systems.

The Solution

The scheme involves the supply and installation of ceiling gas fired warm air heaters, gas pipework infrastructure and associated flues and controls. Low Pressure Hot Water (LPHW) office modular energy efficient boilers cascade to ensure maximum efficiency and life expectancy.

The Benefits

  • Realise significant energy savings/efficiencies
  • Reduction in plant maintenance expenditure
  • Plan major and minor works with minimal disruption
  • 24hr Emergency Breakdown response
  • Access to free technical advice
  • Competitive pricing for budgetary control

How can we help you?

MCL provide a reliable and efficient service. We can install energy efficient plant and help you budget accurately to identify energy cost savings. Subsequently, we can service and maintain the installation.